<img alt="" src="https://secure.agile-company-247.com/261995.png" style="display: none"> Korellis System Control | Customer Review | | Joblogic®
Loading...
Live Chat   Live Chat
korellis-systems-control-technician-4

The story in brief

Founded in 1985, Korellis Systems Control is a heating, ventilating and air conditioning (HVAC) service based in Hammond, Indiana, USA.

korellis-systems-control-technician-4
01
Their Challenge

Korellis Systems Control needed a simpler way to manage their mechanics and a more efficient method for handling invoices.

02
How Joblogic helped

Having already used job management software in the past, they implemented Joblogic into their business in January 2018. Since then, Korellis Systems Control has seen improvement with their overall workflow.

03
The outcome

Korellis Systems Control provided constructive suggestions which Joblogic assessed and embedded into their long-term improvement process. We are always open to customer feedback.

Challenge & Opportunity

Icon (1)
Challenge

NCG’s spreadsheet-based maintenance process became unmanageable, slowing visibility and collaboration across 75+ services.

All maintenance jobs were managed in a single spreadsheet, making it difficult to handle work across 75+ services.

The system became harder to maintain as more sites were added.

Tasks were tracked manually using a basic traffic-light system, leading to confusion and slow updates.

Long email chains were required for updates, resulting in poor visibility and inconsistent collaboration.

Departments and external contractors struggled to work together efficiently due to slow and fragmented communication.

Icon
Opportunity

NCG needed a scalable, centralised system to streamline maintenance operations and improve real-time visibility and teamwork.

NCG needed a structured, centralised system that could scale with 75+ services.

They required real-time visibility of maintenance and compliance.

The team wanted a solution that supports live job tracking and instant reporting.

They needed a simple, easy-to-use interface suitable for colleagues with varying technical skills.

NCG aimed to improve collaboration across departments and with external contractors.

The project timeline

An overview of the four essential phases guiding the project from initial discovery to final delivery.

STEP

1

Vector (9)
Discovery & Validation of Business Needs

Conducted in-depth workshops with key stakeholders to understand challenges, map current workflows, and validate the most critical needs for change.

STEP

2

Vector (10)
Solution Design & MVP Definition

Outlined the core MVP features—intelligent scheduling, mobile engineer app, invoicing, and reporting—aligned to business priorities.

STEP

3

Vector (11)
Pilot Testing & Feedback

Launched a pilot with selected engineers to validate usability, collect feedback, and refine the system before wider deployment.

STEP

4

Vector (12)
Full Implementation & Training

Rolled out Joblogic across departments with structured onboarding and tailored training for engineers, administrators, and managers.

STEP

5

Vector (13)
Optimization & Improvement

Introduced advanced reporting and a customer portal while providing ongoing support and enhancements to drive long-term value.

korellis-systems-control-technician-4
Korellis System Control-2
Pete Korellis

President, Korellis Systems Control

Korellis System Control-2
Pete Korellis

President, Korellis Systems Control

korellis-systems-control-technician-4
No spam. Your information will never be sold or shared.
Please complete this required field.