Woman sat looking at dashboards on her computer | Joblogic

Challenge · Margin and cash flow

You quoted a margin. You’re not sure you got it.

You quote a margin on every job. By the time labour, parts, travel and subcontractor invoices are in, nobody’s checked it held. Joblogic ties the quote to every cost and to the final invoice, so margin per job and per contract is visible while you can still act on it.

Do you know where margin slips in your business?

Enterprise

Across dozens of contracts, margin looks healthy on the group report, but by the time that report is built, the contract that’s actually losing money has been running that way for months and nobody at head office has seen it yet.

Enterprise

Growing business

With ten or more engineers quoting and completing jobs their own way, margin varies from job to job for reasons nobody can explain, and invoices go out whenever someone remembers to raise them, not the day the job finishes.

Growing business

Small business

You know roughly what a job should make, but by the time you’ve chased parts receipts and remembered what a subcontractor charged, the real number is a guess, not a figure you’d bank on.

Small business

Enterprise

Margin problems shouldn’t wait for month end

Joblogic reporting dashboard with KPI doughnut charts and bar charts shown on a white iMac

A losing contract hides inside a healthy average

Group-level reporting can show a healthy average margin while individual sites or contracts run at a loss underneath it, because nobody at head office can see contract-level performance until the numbers are consolidated weeks later.

Joblogic reporting dashboard open on a desktop computer, showing KPI doughnut charts

Every region invoices on its own timetable

Some sites raise invoices the day a job completes, others batch them monthly, and a few let them build up until someone chases them, so cash collection across the group depends on which region did the work, not the group’s actual terms.

Professional man in a suit at a desk with a laptop, checking his smartphone

A cost standard rarely survives a full quarter

Head office sets one way of logging labour, parts, and subcontractor costs against a job, and within a quarter half the regions have quietly reverted to their own version, because nobody at group level can see whether the standard is being followed.

Enforce one cost and margin standard group-wide

See the loss while it’s still small enough to fix

Margin per job, per contract, and per site rolls up into one group dashboard, then drills down to the region or contract dragging the average down, so head office sees the loss while it’s still small enough to fix.

One cost standard, every site

Every job across every site logs cost against the same structure, set once at group level, so a contract’s margin means the same thing whichever region, site or subcontractor did the work.

No region can quietly rewrite the terms

Every framework contract’s billing terms, rates, and margin targets sit against the contract itself at group level, so a region can’t quietly agree its own terms with a client and change the numbers head office is relying on.

Cash reconciled without the spreadsheet chase

Invoices raised across every site post straight into the group’s accounting system the same way, so finance reconciles cash collected against work completed group-wide, without every region emailing spreadsheets to head office at month end.

£6.5m to £20mturnover growth since 2018, East West Connect

Since adopting Joblogic in 2018, our maintenance department turnover has grown from £6.5 million to £20 million. That growth is a direct result of capturing every job, streamlining invoicing, and gaining complete visibility across the business.

Sam AllenDirector of MaintenanceEast West Connect

Ready to enforce one margin standard group-wide?

One conversation about your operation. A clearer view of what comes next.

Growing business

With more engineers and more jobs each week, nobody can tell you which contracts are actually making money

Two engineers in yellow hi-vis vests reviewing a laptop together in an industrial plant room

Quotes vary depending on who wrote them

Every estimator prices a similar job differently, some padding for safety and some cutting it fine to win the work, so margin swings job to job for reasons that have nothing to do with the job itself.

Warehouse worker in yellow hi-vis and hard hat using a tablet in front of warehouse shelving

Invoicing depends on who remembers first

With ten or more engineers finishing jobs across the week, invoicing depends on whoever remembers to raise it, so completed work sits unbilled for days while the cash it represents stays out of the business.

Joblogic scheduling calendar on a laptop, showing colour-coded job cards for the week

Growth is adding turnover, not profit

Revenue is climbing every quarter, but nobody can say with confidence whether the margin is climbing with it or getting eaten by extra admin, extra subcontractors, and extra jobs that quietly ran at a loss.

Keep quotes, costs and invoicing consistent across the team

Consistent quotes, whoever writes them

Every estimator quotes from the same schedule of rates and cost templates, so margin expectations are consistent whoever wrote the quote, not a guess that depends on which estimator picked up the enquiry.

Margin across the whole team, one view

Costs from every engineer, every job, and every subcontractor invoice roll up in one place, so you see margin across the whole team’s work this week, not one job you happened to check.

Every job invoiced the same day it’s done

Every engineer’s completed job triggers an invoice the same way, whoever they are, so a growing team bills consistently instead of some jobs going out same day and others sitting for a fortnight.

Spot a losing contract before it drags the month down

Margin per job and per contract rolls into one dashboard, so you spot the quote that’s underpriced the work or the contract sliding into a loss before it drags the whole month down.

94%maintenance contract revenue up
11%customer profitability up

We’ve grown from £5 million to £20 million, and Joblogic has scaled with us the whole way. It’s never held us back.

Ian MarriottManaging DirectorAccent Services

Ready to make margin consistent across the team?

One conversation about your operation. A clearer view of what comes next.

Small business

You did five jobs this week. Which ones made money?

Plumber in a checked shirt and blue cap using a screwdriver on a boiler unit

Parts receipts turn up after you’ve quoted

You price the job from memory or a rough guess at parts cost, then the receipt turns up a week later for more than you budgeted, and the margin you thought you had is already gone.

Field engineer standing beside a white van in a residential street, checking his smartphone

You invoice when you get round to it

Between the job finishing and you finding time to write up the invoice, days pass, sometimes weeks. The cash you earned is sitting uncollected, and the bank balance doesn’t reflect the work you’ve done.

Joblogic mobile app open on a smartphone showing reporting doughnut charts, placed on a concrete surface next to a yellow pipe

One bad job wipes out three good ones

You don’t find a job ran over budget until long after it’s finished, so the loss gets absorbed into the month, and you can’t tell which job pulled your margin down.

See what every job costs, and bill it fast

See the margin before you invoice

Every part, hour, and subcontractor cost you log against a job adds up in real time, so you see the job’s actual margin before you invoice it, not weeks after when it’s too late.

Invoice goes out the moment the job’s done

The invoice is ready the moment the engineer marks the job complete on their phone, so you send it that day instead of whenever there’s a spare hour at the desk.

Get paid days sooner, not weeks later

Customers pay online the moment the invoice lands, by card or direct debit, instead of a cheque that arrives whenever it arrives, so the cash from a finished job reaches your account days sooner.

An absolutely fantastic product. A must for any service company who wants to save money and increase cash flow. As a result of Joblogic, the business is running much more efficiently, saving on paperwork and unnecessary journeys to the office.

StephenOwnerWalker Gas

Ready to see your real margin?

One conversation about your operation. A clearer view of what comes next.

Which tier fits how you track margin?

If you’re still costing jobs from memory, start with Standard. Once margin needs to stay consistent across a growing team, Premium adds control. Enterprise standardises margin across every site.

Standard

Suits small teams pricing jobs from memory or a rough guess, who need to see job cost and get invoices out without hiring extra admin.

Covers job costing, online invoicing and customer payment options, so a small team sees what a job actually cost and gets paid for it without extra admin.

See Standard pricing

Premium

Fits growing teams where quotes and invoicing vary by whoever’s doing them, and margin needs to hold consistent across every engineer and every job.

Adds standard quoting, team-wide job costing and margin reporting across contracts, so quotes, costs and invoicing stay consistent whoever on the team is doing the work.

See Premium pricing

Enterprise

Suits multi-site operations where a losing contract can hide inside a healthy group average until head office builds the next report.

Adds group-wide dashboards, contract-level billing terms and one cost standard enforced across every site, so head office sees a losing contract before the quarter closes.

See Enterprise pricing

How margin slips in your industry

Construction & real estate

Project costs shift between quote and completion, and retention payments delay final cash for months, so margin looks fine until the job closes.

See it in construction and real estate

Facilities management

Framework contracts each bill on different terms and schedules, so margin per contract is easy to lose track of across a growing client list.

See it in facilities management

Cleaning services

Contracts are thin margin and high volume, so a small pricing slip on one site stays invisible until it repeats across dozens of others.

See it in cleaning services

Equipment repair & maintenance

Parts prices move between the quote and the repair, so the margin you quoted often isn’t the margin you actually collect on the invoice.

See it in equipment repair and maintenance

Common questions on margin and cash flow

How do I see a job’s real margin before I invoice it?

Every part, hour and subcontractor cost you log against the job adds up as you go, so the margin is visible before you send the invoice, not calculated afterwards from memory or a stack of receipts.

Can I invoice the same day a job finishes?

Yes. Once an engineer marks a job complete on their phone, the invoice is ready to send straight away, so the gap between finishing work and getting paid for it is a choice, not a wait.

How do you stop different estimators pricing jobs differently?

Quotes are built from the same schedule of rates and cost templates, so a job’s expected margin doesn’t depend on which estimator picked it up. It’s consistency by design, not by asking everyone to be careful.

Will this actually speed up how fast we get paid?

For work invoiced through the system, yes. Completed jobs trigger an invoice the same way whoever raised it, so cash collection stops depending on one person remembering. Work invoiced outside the system won’t see the same improvement.

How quickly can head office spot a contract losing money?

As soon as the underlying jobs and costs are logged, not at the next reporting cycle. Margin rolls up to group level in the same dashboard, so a contract sliding into a loss shows up while it’s still small enough to fix.

Can we enforce one costing standard across every region?

The cost structure is set once at group level, so a region can’t quietly agree its own rates or margin targets. It’s partial where legacy contracts predate the standard, and that’s an honest limit until those contracts are migrated across.

Which pricing tier actually helps with margin, not just admin?

It depends on where the visibility gap is. Standard covers job costing and invoicing for a small team. Premium adds consistent quoting and margin reporting for a growing team. Enterprise adds group-wide dashboards and one cost standard across every site.

How long before margin reporting is actually reliable?

Reporting is reliable from the first job costed and invoiced after go-live. Historic job costs and past invoices need to be migrated or re-entered, and how long that takes depends on how much of that history exists and how it’s stored today.

See where your margin is actually going

Bring a few real jobs and a recent invoice run to the call. We’ll show margin and cash flow tracking against how your business actually costs and bills work.